Commercial Stucco Installation in Johns Creek

We install three-coat portland cement stucco on Johns Creek commercial and multifamily buildings over a lapped weather barrier, properly furred lath and a working weep screed, with control joints and flashing laid out before the scratch coat.

  • Three-coat cement stucco
  • Weather barrier & lath
  • Control joints & screed
  • New work & re-clads
1999Georgia stucco work
Three-coatScratch, brown & finish
WrittenItemized quotes

Request a commercial quote

Johns Creek commercial stucco & EIFS. Property managers, boards, owners & builders.

Thank you. Your request is in, and an Advanced Stucco Repair commercial estimator will contact you shortly. If it is urgent, call (770) 758-5861.

We never share your information. Prefer to talk? Call (770) 758-5861.

Built to drain

Hard coat stucco built to drain and to last

Three-coat stucco is durable, impact resistant and well suited to the ground floors of retail, mixed-use and multifamily buildings. It is also absorbent: it takes on rain and dries back out. A hard coat wall stays dry only when the layers behind it are built to let water out.

That starts with a weather-resistive barrier lapped shingle-fashion and integrated with window, storefront and door flashing. Lath is fastened so the scratch coat can key in behind it. A weep screed or drainage termination at the base gives water an exit and is kept clear of paving and planting. Control joints are laid out at the spacing and locations the wall needs, so shrinkage and movement crack along a straight line instead of across the face.

Then we apply the scratch and brown coats, allow proper curing between them, and finish with the color and texture approved on a sample panel. In Georgia's summer heat that means moist curing and timing the work to the weather. On Johns Creek projects we coordinate all of this with the general contractor's schedule and the trades setting windows, roofs and sealants around us.

Exterior wall being prepared for weather barrier and stucco
1999installing Georgia stucco
What goes into the wall

Every layer of a commercial stucco wall

A finished three-coat wall is a little under an inch thick, but it is built from six separate parts. Skip one and the others cannot make up for it.

Weather-resistive barrier

Barrier lapped top over bottom, so water that gets past the stucco runs down and out instead of into the sheathing.

Lapped like shingles

Metal lath

Self-furred lath fastened into the framing and held off the barrier, so the scratch coat wraps around it and locks in.

Fastened to framing

Weep screed & casing beads

A weep screed at the base lets water drain out; casing beads finish the edges at windows and storefronts with room for sealant.

Clear of grade & paving

Control & expansion joints

Joints break long elevations into panels and isolate floor lines, so building movement shows up at the joint instead of as random cracking.

Laid out before lath

Flashing & kick-outs

Head flashing over openings, parapet and coping details and kick-outs at roof-to-wall lines go in with the barrier, where they can be lapped correctly.

Where most leaks start

Three coats, properly cured

Scratch, brown and finish coats applied in sequence, with base coats kept damp and given time to cure before the next goes on.

No rushing the cure
Which project?

New buildings, additions and re-clads

On new construction we coordinate with the general contractor, framer, window and storefront installers and roofer so barrier and flashing go in in the right order. On an addition, the new wall has to tie into the existing stucco without a visible seam, which means matching texture and planning a joint where old meets new.

A re-clad is the biggest job, and on an occupied building it is planned elevation by elevation: the failed cladding comes off, we inspect and replace damaged sheathing, then install a complete new system before moving on. If the existing stucco is sound and the goal is a new look, a recoat or color change may be all the building needs.

Typical commercial stucco projects
ProjectWhat’s involvedKey detail
New constructionWhole buildingBarrier, lath, three coatsFlashing sequenced with trades
AdditionNew wing or tenant spaceFull system on new framingTexture tied into existing
Re-cladFailed cladding offSheathing checked, new systemPhased around occupants
Partial elevationOne facade or towerNew system to a clean breakJoint at a corner or band
Our process

How a commercial stucco wall is built

Three-coat stucco takes time because each coat has to cure. Much of the schedule is curing, not labor, and that time is what makes the wall last.

Review & prepare

We review drawings and joint layout, check the sheathing, install the weather barrier from the bottom up and integrate it with window, storefront and roof flashing.

  • Joint layout confirmed
  • Barrier lapped correctly
  • Kick-outs installed

Lath & accessories

Weep screed, casing beads, corner aids and control and expansion joints go on with the lath, fastened into the framing and laid out to suit each elevation.

  • Screed set above grade
  • Joints laid out by panel
  • Lath fastened to framing

Three coats & cure

The scratch coat is scored and kept damp, the brown coat is floated flat and allowed to cure, then the finish coat sets the specified texture and color.

  • Base coats moist-cured
  • Cure time between coats
  • Finish to the spec

Bidding new construction or a re-clad?

Bring us in before the windows go in. Flashing, barrier and joint details are easiest to get right early.

Request a commercial quote
New stucco in Johns Creek

Hard coat where the traffic is

On new Johns Creek retail, mixed-use and multifamily work, hard coat stucco is often specified where the building meets the public.

Ground-floor storefronts, amenity buildings, garden walls and the lower levels of apartment buildings take carts, bikes, maintenance equipment and constant contact. Hard coat handles that abuse better than softer systems, which is why it is often paired with EIFS above. Around Johns Creek Town Center and along the busy corridors, new buildings also have to look finished on day one, so layout of control joints and reveals is planned as part of the design, not added afterward.

Joint layout

Control joints and reveals aligned with openings and the architecture.

Impact zones

Durable hard coat at storefronts, entries and ground-floor walls.

Curing in Georgia heat

Coats timed and moist-cured to avoid shrinkage cracking in summer.

  • Johns Creek
  • Johns Creek Town Center
  • Medlock Bridge Road
  • State Bridge Road
  • McGinnis Ferry Road
  • Peachtree Parkway (GA 141)
  • Alpharetta
  • Suwanee
  • Cumming
  • Milton
Questions & answers

Stucco installation questions in Johns Creek

What Johns Creek developers, owners and general contractors ask about new hard coat stucco.

Does new stucco on a Johns Creek commercial building need inspections?
Requirements depend on the project and scope. The general contractor or owner usually holds the permit; check with the City of Johns Creek building department for what applies. We schedule our layers so any required inspections can happen before work is covered.
Are there design standards for new buildings near Johns Creek Town Center?
Projects in some areas of the city can be subject to design guidelines on materials and appearance. Check with City of Johns Creek planning staff for your site. We can provide sample panels and finish options for review.
How long does three-coat stucco take?
Each coat needs time to cure before the next is applied, and weather affects that timing. We build the curing time into the schedule we give the general contractor rather than compressing it.
Hard coat or EIFS for a new commercial building?
Many buildings use both: hard coat where impact resistance matters, and EIFS where insulation, weight and architectural shapes matter. We can price either or a combination.
How do you prevent cracking in new stucco?
Proper control joint layout, correct lath attachment, appropriate coat thickness and good curing. Hairline shrinkage cracks can still occur in cement stucco, which is why joints are planned to control where movement goes.